cyktai001 wrote:no, the bridge is dual carriageway. but from the Kong Kong area onwards, Pulau Juling inclusive, right up to the bridge is single lane. then bridge dual lane. after bridge become single lane again all the way to desaru. it was enjoyable driving from Ulu Tiram to Kong Kong. but thats about it...
i reckon since i can drive all the way from JB to Ulu Tiram, i might as well take Kota Tinggi Road and bypass the single lane Cahaya-Penawar section altogether WHEN they start charging us... even now, return trip RM9.40, also quite pissed off due to the single lane thing...
i think the jams at the toll is a result of stupid design of the toll area. as for the jam when i was heading back, mainly from bridge to pulau juling to kong kong, its because everyone need to merge from 2 lanes on bridge into a single lane, then most pple dun give way. and when there's a single hogger on the single lane road, everyone gotta slow down
toll not chargable yet right?
i think i need to check it out myself during the FOC period.
about 2 weeks ago, we tried via Pasir Gudang direction and the road leading to Desaru was sealed off, so we paid the toll there and return to Carrefour..