Page 41 of 42

Re: Singapore - Feedback (Q1 2010)

Posted: Tue Dec 21, 2010 1:58 pm
by epi
V.101220,
A short distance of 2-line road.

Re: Singapore - Feedback (Q1 2010)

Posted: Tue Dec 21, 2010 6:19 pm
by epi
V.101220,
Please correct the routing. The routing shown entered through OUT pathway to Destination.
Thanks.

Re: Singapore - Feedback (Q1 2010)

Posted: Tue Dec 21, 2010 7:39 pm
by epi
V.101220,
Tanglin Halt Rd pathway.
The X marked pathway supposed to be pedestrians pathway.
Please verify and to delete all the X marked pathway track line.
The pathway for vehicles is only a IN and OUT pathway as shown.
Thanks.

Re: Singapore - Feedback (Q1 2010)

Posted: Wed Dec 22, 2010 6:07 pm
by Pel
MFM-Garmin 101220

Correction to HDB service road in Anchorvale Link (please refer to attached diagram - actual roads are in red). Thanks!

Re: Singapore - Feedback (Q1 2010)

Posted: Wed Dec 22, 2010 10:15 pm
by epi
V.101220,
A partial 2-line traffic flow of "Jalan Kayu". Please check through a whole long road of "Jalan Kayu".
Thanks.

Done! 210 - OngCC

Re: Singapore - Feedback (Q1 2010)

Posted: Fri Dec 24, 2010 9:55 pm
by epi
V.101220,
Yishan Ring Rd is a 2-line road. Please check through a whole entire length of "Yishan Ring Rd".
Thanks.

Re: Singapore - Feedback (Q1 2010)

Posted: Fri Dec 24, 2010 10:28 pm
by epi
V.101220,
Partial 2-line road of Yishun Ave 9.
Thanks.

Re: Singapore - Feedback (Q1 2010)

Posted: Mon Dec 27, 2010 1:59 am
by epi
V.101227,
Amara Hotel (Drop Off) etc..
Thanks.

Re: Singapore - Feedback (Q1 2010)

Posted: Tue Dec 28, 2010 8:55 pm
by yoladu
mfm v101227,

The Singapore Navy has no presence in Pu Brani. That part of the island is now occupied by the Singapore Police Coast Guard.

Please delete these two POIs.

Re: Singapore - Feedback (Q1 2010)

Posted: Wed Dec 29, 2010 9:54 pm
by epi
V.101227,
Telok Blangah Way ia a 2-line rd..
Tahnks.

Done! 211 - OngCC